Mobile chromium plating systems

Chrome plating of all metals, plastic, wood, glass, hard rubber and much moreMobile chrome plating systems

Perfect chrome plating step by step

Working instructions for the metallisation process with CLC

The CLC metallisation process enables you to achieve a high-quality, reflective chrome finish on a wide variety of surfaces. To ensure that the process runs smoothly and you achieve the best results, we have compiled a clear overview of the individual steps for you. Follow the instructions carefully and enjoy the brilliant effects that are only possible with precise preparation and workmanship.

1. Preparation on the first day of work

1. Surface preparation:
First apply a 2K single-component paint to the object to be treated in order to create a smooth base.
2. Sanding:
Once dry, sand the paint with wet sandpaper (1200 grit) to achieve a completely smooth surface.
3. Cleaning:
Clean the object thoroughly so that no dust or dirt particles interfere with the metallisation.
4. Masking:
Cover areas that are not to be chrome-plated.
Primer application:
Mix the CLC 2K primer in a ratio of 100:15:30/50 and spray 1–2 thin coats onto the object.
5. Drying:
Allow the primer to dry for about 90 minutes at 60 °C and then leave it to rest overnight.
⚠️ From now on, the painted surface must not be touched with your fingers.

2. Further processing on the second working day

1. Dust removal:
Rinse the object with fully deionised (demi) water to remove dust and dirt.
2. Apply activator:
Wet the surface evenly with the CLC activator.
Note: The activator must be aged for at least 72 hours, otherwise optimal wetting will not occur.
3. Rinse off the activator:
Rinse the surface again with fully deionised water to remove excess activator.
4. Metallisation:
Apply the CLC metallisation solution.
5. Rinse:
Rinse off excess metal solution with fully demineralised water.
Cleaning the surface (except for Holoprint):
Spray the metal surface with CLC cleaner and leave it to work for 60–90 seconds. Then clean again with fully demineralised water.
6. Drying:
Blow the surface dry evenly.
7. Post-drying:
Dry the object for 20 minutes at 30 °C.
8. Preservation and colour glaze:
Lightly mist the 1-K CLC preservation varnish onto the object, mix in the desired colour glaze to determine the shade. After the drying time, spray on a rich layer.
9. Top coat application:
Spray on two coats of 2K top coat and leave to dry overnight at room temperature. Alternatively, you can dry it in a drying cabinet – stay 20 °C below the base coat drying temperature.

This carefully structured workflow ensures a durable, shiny and professional chrome plating result with the CLC system. Precision, cleanliness and adherence to the times are the keys to success.

For demonstrations, demos, production (commissioned work), etc. please call to make an appointment.

Address Germany

Verchromen24
Gropiusstraße 7
48163 Münster
Germany

Address Spain

Verchromen 24 S.L.
Calle Coll Ver 3
03700 Denia (ALICANTE)
Spain

Contact

Phone Spain
+34 665 531 292

Contact Form
Click here

Follow us on

© 2025 Verchromen24 S.L.